Most of the mechanical and body work was done before the car arrived at Ragtops.
Date: 01/23/2007
Views: 298
The engine was rebuilt and is ready for sorting.
Date: 01/23/2007
Views: 276
The interior recieves Dynamat sound and vibration insulation.
Date: 01/23/2007
Views: 264
OE-style carpet is installed inside the car.
Date: 01/23/2007
Views: 286
Carpets installed along with the center console.
Date: 01/23/2007
Views: 267
The convertible top frame in place.
Date: 02/06/2007
Views: 263
The convertible top installed.
Date: 02/06/2007
Views: 278